Before picture
![]()
This is it. Not much to look at yet but I am planning a lot of work for it. This is right after I replaced the kingpins, painted the front drums, and put these wheels on it. Follow along as I try to document the rebuild process. Since purchasing the truck, I've replaced the kingpins, window channels and weatherstrip, ignition switch, repaired the light wiring harness to OEM configuration, adjusted the valves and carb, added new wheels and tires, added amp, oil, and temp guages, rewired dash panel, removed 99percent of the rattles and squeaks, and started sanding badly rusted areas. Near future work planned will include total rewiring of the entire truck, 351W transplant, Mustang II front end, and tinted glass. Update: I have finally made some progress with the rebuild. The Mustang II suspension is welded in, rear mono leafs were installed, the 351W has been installed and a new driveshaft made. I have reinstalled the repaired and primered cab on the chassis and am working on the doors and fenders now. I will post more pics as soon as I purchase a new camera. Check back often as you never know what I might get done! |